Full-Auto Packaging Machine Soft Paper Towel

Packaging Type: Film
Type: Automatic Wrapping Machine
Driven Type: Electric
Application: Automatic Facial Tissue Packaging Machine
Automatic Grade: Automatic
Inclusion Degree: Soft Paper Towel Packaging Machine
Customization:
Diamond Member Since 2008

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CIL-FT-602
Structure
Soft Paper Towel Packaging Machine
Film Frame Structure
Soft Paper Towel Packaging Machine
Series
Soft Paper Towel Packaging Machine
Packaging Speed
25-50bags/Min
Transport Package
Standard Export Packing Wooden Case
Specification
CE
Trademark
Xinda machinery
Origin
Fujian, China (Mainland)
Production Capacity
30 Set/Month

Product Description

Full-auto Packaging Machine Soft Paper Towel
Principal capability and technical feature:
1. Adopt packing method by wrapping, hemming and sealing with compact structure and high product appeal.
2. Adopt the controlling system of step-less frequency conversion, touching screen and PLC, clear display and easy maintenance.
3. Adopt auto-putting conveyor, easy to be connected with automatic production line, saving laboring cost.
4. Stepless-speed regulation, packing speed and length of film can be arbitrary adjusted.
5. High automatization, high specialization, high efficiency but less trouble.
6. Differnet sizes can be handled easily thanks to a fast and simple changeover facility.

Model & Main technical parameters:
Model FT-602A
Outline Dimension (mm)3560*5885*1925
Speed (bags / min)25-50
Packing size (mm)100-230*100-150*40-100
Machine's Weight (KG)3000
Motor Consumption (KW) 3.66
Heating Consumption (KW) 3.6
Power380V 50Hz
Power Consumption (KW) 7.26
Packing filmCCP, PE, OPP/CPP, PT/PE and other film sealed on both sides

The machine video link please click here:

http://qzxinda.en.made-in-china.com

After service:
1. The guarantee is one year. After the machine arrive the buyer's factory, if the buyer requests, the seller has to send the engineer to the buy's factory to install and test the machine, and offer training for the buyer's engineer about 5-10days. The buyer should pay the round trip ticket, hotel, food, local traffic and salary USD80 per day for each seller's engineer.
2. The electrical components, the loss by nature and artificial damage created by unprofessional technician, not in maintenance scope.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now